Alarm management is what separates an online condition monitoring system that prevents failures from one that produces noise. Sensors and software can watch hundreds of machines continuously, but value only appears when each alarm is set at the right level, reaches the right person and triggers a defined action before the fault becomes a breakdown. The same applies to every online condition monitoring Indonesia project, from a single compressor to a whole plant.
This article is for reliability engineers, condition monitoring analysts, control room supervisors and maintenance managers in Indonesia who already run, or are about to commission, online monitoring on critical rotating and electrical equipment. It explains the types of condition monitoring alarms, how limits are set, how to route alerts, how to cut nuisance alarms and how PT Tiara Vibrasindo Pratama (TVP) connects alarm management to its monitoring services.
Key Takeaways
- Alarms are decisions, not data: every alarm should have a defined meaning, a responsible person and an expected action.
- Start simple, then personalise: begin with standard absolute limits, then move to limits based on each machine’s own baseline.
- Operating state matters: alarms that ignore speed, load or start-up conditions are the main source of nuisance alerts.
- Borrow from process control: EEMUA 191 and ANSI/ISA-18.2 offer a proven lifecycle for alarm management that suits condition monitoring well.
- Review against outcomes: compare alarm history with confirmed findings and repairs to tune limits over time.
- Route by severity: analysts, planners and operators need different alerts, at different speeds.
Why Alarm Management Decides the Value of Online Monitoring
Online monitoring is usually justified by a simple promise: faults will be detected early enough to plan the repair. That promise rests on the alarm. If the alarm is set too high, the fault grows unnoticed until it is obvious to everyone. If it is set too low, or set the same way on every machine, the system raises so many alerts that people stop reading them. Both failures look the same in the end: a machine breaks down while the monitoring system was technically running.


Plants that install condition monitoring hardware often accept the default limits shipped with the software. Those defaults are a reasonable starting point, but they know nothing about the machine, its foundation, its process or its history. A pump on a flexible base and a compressor on a rigid concrete block will not share the same normal vibration level. Good alarm management replaces generic settings with limits that reflect each asset.
The cost of poor alarm management is also human. Analysts who face hundreds of unexplained alerts each week learn to acknowledge them quickly and move on. When a genuine developing fault finally appears, it is buried among false alarms. Restoring trust after this happens takes far longer than setting the alarms correctly in the first place.
Alarm Management Principles Borrowed from Process Control
Process industries learned these lessons in control rooms long before online machinery monitoring became common. Two references dominate. EEMUA 191 is a widely used guide to the design, management and procurement of alarm systems, and ANSI/ISA-18.2 defines an alarm management lifecycle for the process industries, later adopted internationally as IEC 62682. Both are written for operator alarms, but their principles transfer directly to condition monitoring.
The central idea is that every alarm must be useful, relevant and actionable. ISA-18.2 offers benchmarks that make this concrete: around 150 alarms per day per operator is considered very likely acceptable, and more than 10 alarms in 10 minutes is treated as an alarm flood. A condition monitoring analyst is not a control room operator, yet the same limits of human attention apply. An analyst who receives a flood of alerts cannot investigate each one properly.
The lifecycle approach is equally valuable. Rather than setting limits once and forgetting them, alarm management becomes a repeating cycle of philosophy, identification, rationalisation, implementation, monitoring and change. The general overview of alarm management explains how this cycle is applied in practice.
Types of Alarms in Online Condition Monitoring Indonesia Systems
Condition monitoring systems offer several alarm types. Each answers a different question, and a mature program uses a combination of them rather than relying on one.

| Alarm type | Question it answers | Typical use | Main limitation |
|---|---|---|---|
| Absolute level | Is the value above a fixed limit? | Overall vibration velocity, bearing temperature | Ignores the machine’s own normal level |
| Baseline-relative | Has the value risen compared with this machine’s normal? | Overall and band values after commissioning or repair | Needs a reliable, documented baseline |
| Statistical | Is the value outside the normal spread of its history? | Stable machines with long data history | Can drift if faulty data enters the history |
| Rate of change | Is the value rising faster than expected? | Fast-developing faults, temperature trends | Sensitive to noise and process transients |
| Spectral band | Has energy increased at a specific fault frequency? | Bearing defect, gear mesh and running speed bands | Requires correct speed and component data |
| State-based | Is the value abnormal for the current operating state? | Variable speed or variable load machines | Requires reliable state signals from the process |
Spectral band alarms deserve special mention. An overall vibration value can remain almost unchanged while energy at a bearing defect frequency rises sharply. Band alarms catch this pattern early, which is why analysts with skills from courses such as Advanced Vibration Analysis configure them around the actual components of each machine.
Setting Vibration Alarm Limits
For vibration, most programs begin with the evaluation zones in ISO 20816-1 and the machine-specific parts of the ISO 20816 series. These zones classify broadband vibration velocity, measured in mm/s RMS, from newly commissioned condition (zone A) to levels that may cause damage (zone D). Zone boundaries depend on machine size and support type, so the correct part and class must be selected for each machine.
Zone limits are a sensible ceiling, but early detection needs limits closer to each machine’s normal behaviour. A widely used practice sets the alert level at the baseline plus 25% of the zone B upper boundary. For example, if a machine runs at a stable baseline of 2.0 mm/s and the zone B upper boundary for its class is 4.5 mm/s, the alert would be set at about 3.1 mm/s, well before the machine approaches the zone boundary itself.
Once several months of stable data exist, statistical limits refine the picture. A common approach places the alert at the mean plus three standard deviations of the stable history, a method rooted in statistical process control. The data must be clean, however. If readings taken during a developing fault are included in the history, the limit will rise with the fault and hide it.
Transient events such as run-up and coast-down need separate treatment. Large machines like turbines and compressors pass through critical speeds during start-up, and alarm logic tuned for steady running will either trip constantly or be disabled. Dedicated transient analysis, such as TVP’s Vibration Transient Analysis service, gives the data needed to set sensible limits for these phases. Typical machine trains covered in TVP’s catalogue include turbines and compressors.
Routing Alerts to the Right People
An alarm that reaches the wrong person is almost as bad as no alarm. Good alarm management defines severity levels and assigns each level to a responder with a target response time. A practical structure looks like this:

- Advisory: a small change against baseline. The analyst reviews the trend at the next scheduled analysis and may add the machine to a watch list.
- Alert: a confirmed rise or a new fault frequency. The analyst investigates within a defined period, for example 24 hours, and issues a diagnosis and recommendation.
- Alarm: a significant level or rapid change. The analyst informs the area supervisor and planner the same shift, and corrective work is planned.
- Danger: a level that threatens safety or major damage. Operators follow the agreed response, which may include load reduction or shutdown according to plant procedures.
The key is that each level has an owner and a time frame written down before the alarm occurs. When responsibilities are agreed in advance, nobody has to decide under pressure whether a notification is important or who should act on it.
Electrical assets follow the same logic. Monitoring of switchgear, for instance through TVP’s Switchgear Monitoring service, produces temperature and partial discharge alerts that belong with the electrical team, not the mechanical analyst. Routing rules should reflect who can actually act.
Reducing Nuisance Alarms Without Missing Faults
Nuisance alarms are alerts that do not lead to any action. A small number is unavoidable, but a high rate is a sign that alarm management needs attention. The following measures reduce them while keeping genuine warnings visible:
- State filtering: suppress or adjust alarms when the machine is stopped, starting or running at a different load band.
- Time delays: require a condition to persist, for example for several minutes, before raising an alarm, to filter short process spikes.
- Deadbands: stop alarms from chattering on and off when a value hovers around the limit.
- Grouping: combine alarms from several sensors that see the same fault into one notification.
- Sensor health checks: treat bias voltage faults, cable problems and flat-line signals as instrument alarms, not machine alarms.
- Machine-specific limits: replace copied defaults with limits based on each asset’s own baseline.
Each change should be documented with the reason behind it. Undocumented suppression is dangerous, because a later analyst may not realise that a channel has been silenced. A good alarm management record shows who changed which limit, when and why.
Alarm Management as a Continuous Lifecycle
Limits that were correct at commissioning will not stay correct. Bearings are replaced, alignment is improved, process conditions change and machines age. Alarm management therefore needs a recurring review. For critical machines, a review every 6 months is a reasonable starting point, along with reviews after every major repair or modification.
Each review should answer three questions. Which alarms fired most often, and did they lead to action? Which confirmed faults or failures occurred, and did an alarm warn of them in time? Which channels have never alarmed, and are they still measuring the right thing? Alarms with no follow-up are candidates for adjustment. Failures without a preceding alarm reveal missing measurement points or limits set too high.
Simple indicators keep the process honest: the number of alarms per analyst per day, the proportion of alarms that led to a work order, and the share of failures preceded by a timely alarm. Tracking these numbers each month shows whether alarm management is improving or slipping.
How TVP Supports Alarm Management
PT Tiara Vibrasindo Pratama has worked in asset reliability since 1995 and approaches monitoring as an integration of Technology, Business Process and Competency. Alarm management sits at the meeting point of all three: the technology raises alerts, the business process defines who acts, and competency determines whether the diagnosis is right.
TVP’s Condition Based Monitoring service and its Tiara Reliability Remote Monitoring (TRM) program base mitigation decisions on the asset wellness status produced by PdM technology examination. TRM is designed so that the right information reaches the right function at the right time, linking the asset manager, the reliability engineer and the PdM technology specialist. Its Life Cycle Strategy is reviewed periodically to stay aligned with the current condition of each asset, which is exactly the review cycle that sound alarm management requires.
TVP’s experience list also includes monitoring work such as Asset Health Monitoring at BP Berau, showing that asset health monitoring is part of its long-standing field work in Indonesia.
FAQ
What is alarm management in condition monitoring?
Alarm management in condition monitoring is the discipline of deciding which measurements carry alarms, where the limits sit, who receives each alert and what action it should trigger. It covers the full lifecycle, from initial limit setting and baseline review to the rationalisation of nuisance alarms, so that every alert reaching an analyst or operator is meaningful and actionable.
How are vibration alarm limits usually set?
Many programs start with absolute limits taken from the evaluation zones in ISO 20816-1, then move to limits based on each machine’s own baseline. A widely used practice sets the alert at the baseline plus 25% of the zone B upper boundary. Statistical limits, such as the mean plus three standard deviations of stable data, refine this once enough history exists.
What causes alarm floods in online monitoring systems?
Alarm floods usually come from limits copied across machines without adjustment, alarms that ignore operating state, and duplicated alarms on several channels that see the same fault. Start-ups, shutdowns and load changes trigger many of them. State-based logic, time delays and grouped alarms reduce floods without hiding genuine developing faults from the analyst.
How often should alarm limits be reviewed?
Review limits after commissioning, after any major repair or modification, and at a fixed interval for critical machines, for example every 6 months. Each review should compare alarm history with confirmed findings. Alarms that never led to action are candidates for adjustment, and failures that occurred without any alarm show where limits or measurement points are missing.
Can TVP help with alarm management for an existing system?
TVP’s condition-based monitoring and Tiara Reliability Remote Monitoring (TRM) services base mitigation decisions on asset wellness status from PdM technology examination, and that only works with sound alarm management. Contact TVP to discuss your monitoring system, your critical assets and whether a structured review of your current alarm settings fits your needs.
Conclusion
Online condition monitoring is only as good as its alarms. Plants that move from default limits to machine-specific baselines, filter alarms by operating state, route alerts by severity and review limits against real outcomes turn monitoring data into planned repairs. Plants that skip this work end up with alarm floods, ignored alerts and failures that the system technically saw coming. Treat alarm management as a lifecycle, and the investment in sensors keeps paying back.
Talk to TVP. To discuss alarm management for your online monitoring system, email info@tiaravib.com, call 021 5704200, or WhatsApp +62 821-1378-3727. Office: Jl. Penjernihan II No. 5A, Bendungan Hilir, Jakarta Pusat 10210.