A condition monitoring report is the document that turns measurements into maintenance decisions: it tells the plant which assets are healthy, which are deteriorating, what is probably wrong, and what to do by when. If the report does not lead to timely, correct work orders, the monitoring programme behind it has little value, however much data it collects. It is also the clearest way to compare one condition monitoring service Indonesia provider with another.

This guide is for maintenance managers, reliability engineers and planners in Indonesian plants who buy condition monitoring as a service or run it in-house and want to judge whether the reports they receive are good enough. It describes what PT Tiara Vibrasindo Pratama (TVP) considers a complete deliverable, and how to check yours against it.

Key Takeaways

  • A condition monitoring report exists to drive action; every abnormal finding needs a recommendation, an owner and a deadline.
  • Severity levels must be defined in advance and applied consistently across techniques and surveys.
  • Evidence should be selective and annotated, not a dump of every spectrum collected.
  • Coverage matters: the report must state which assets were not measured and why.
  • Urgent findings need a same-day channel; the formal report follows.
  • Feedback from repairs is the only reliable way to measure report quality over time.

Why the Condition Monitoring Report Matters More Than the Data

Plants often evaluate monitoring providers by the number of points measured or the sophistication of the instruments. Those things matter, but the plant never acts on a spectrum. It acts on a sentence such as “replace the drive-end bearing of P-101A within 2 weeks”. The condition monitoring report is where analysis becomes that sentence.

condition monitoring report - Rotordynamic Analysis
Rotordynamic findings belong in the report next to the data that supports them, not in a separate memo nobody reads.
Condition monitoring report chart: Pareto of failed equipment by type
A Pareto of failed equipment by type, the kind of summary a condition monitoring report uses to show where failures concentrate.

When reports are weak, the same failures repeat. Typical symptoms include alarms that are reported month after month without any work being done, recommendations so vague that planners cannot schedule them, and findings buried on page 40 where no decision-maker will see them. In each case the measurement was probably fine. The communication failed.

A useful test is to hand last month’s condition monitoring report to a planner who was not involved in the survey. If that planner can raise the right work orders within an hour, with the right parts and priorities, the condition monitoring report is doing its job. If the planner needs a meeting with the analyst first, the format needs work, regardless of how good the underlying analysis is.

International guidance recognises this. ISO 17359 sets out the general process for condition monitoring and diagnostics of machines, from equipment audit to determining the required maintenance action. ISO 13374 addresses data processing, communication and presentation, including the step from health assessment to advisory generation. Both treat the recommendation as part of the monitoring process, not an optional extra.

Essential Sections of a Condition Monitoring Report

Structure varies by provider and technique, but a complete condition monitoring report should contain the elements below. The table shows what each section is for and who reads it.

SectionContentMain reader
Executive summaryCount of assets by severity, new and escalated findings, overdue recommendationsPlant and maintenance managers
Coverage statementAssets surveyed, assets missed and reason (shutdown, access, sensor fault)Reliability engineer, contract owner
Action listAsset tag, finding, recommendation, priority, target datePlanners and schedulers
Detailed findingsAnnotated evidence, diagnosis, confidence level, trend versus previous surveyReliability and maintenance engineers
Closed findingsRepairs completed and what was found during the repairReliability engineer, analyst
Programme notesChanges to routes, alarm limits, baselines or measurement set-upProgramme owner

The action list is the most important page. It should be formatted so that planners can copy it directly into the computerized maintenance management system without re-interpreting anything. If planners have to call the analyst to understand what is wanted, the condition monitoring report has not done its job.

Severity Levels and Recommendations

Every condition monitoring report needs a severity scale that is defined before the first survey and used the same way afterwards. Four levels are common:

condition monitoring report - Machinery Vibration Assessment
Machinery vibration assessment severity bands give the report one consistent language across every asset in scope.
  1. Normal: no significant change from baseline; continue routine monitoring.
  2. Attention: an early defect or change; monitor more often or plan a minor correction at the next opportunity.
  3. Alert: a developing fault; schedule corrective work within a defined period.
  4. Danger: advanced damage or a safety risk; act immediately and notify by phone or message the same day.

Severity should reflect the condition of the machine, not the amplitude of a single number. For vibration, broadband velocity zones such as those in ISO 20816-1 give a useful first screen. For example, a value rising from 2.8 mm/s to 7.1 mm/s on a medium-sized machine is a significant change even if the absolute level would be acceptable on a different machine class. The analyst then uses spectra, waveform and other techniques to decide what the change means.

Recommendations must be specific. “Check bearing” is not a recommendation. “Inspect and replace non-drive-end bearing; check housing fit; verify lubrication; target within 30 days” is. Each recommendation in the condition monitoring report should also state the confidence of the diagnosis, so the planner knows whether to prepare for one likely fault or several possibilities.

Evidence, Diagnosis and Multiple Technologies

A good condition monitoring report shows enough evidence for an engineer to follow the reasoning, and no more. For a bearing defect that might be one annotated spectrum showing the defect frequency and harmonics, one time waveform showing impacting, and a trend plot. For an electrical fault it might be a current spectrum with sidebands marked. For a hot connection it would be a thermogram with the temperature rise, for example 35 °C above a comparable phase, and the load at the time of measurement.

The strongest diagnoses combine techniques. Vibration may show a gearbox defect while lubricant analysis shows rising iron and particle counts; together they give a confident call and a better estimate of urgency. TVP’s Asset Wellness Analysis services cover several of these technologies, including machinery lubricant analysis, infrared thermography analysis and electrical analysis for induction motors, so findings from different methods can be reported against the same asset in one condition monitoring report rather than in separate documents that nobody cross-checks.

Diagnostic quality depends heavily on the analyst. ISO 18436-2 defines competence categories for vibration analysts, from Category I, who collects data on established routes, to higher categories who diagnose complex faults and manage programmes. A plant should know which competence level reviews its data. TVP’s ISO Vibration Course and Certification Category II is one route for in-house staff who want to read and challenge the reports they receive.

Coverage, Trends and Programme Health

A condition monitoring report can look clean simply because problem machines were not measured. That is why a coverage statement is essential. It should list every scheduled asset that was not surveyed and the reason, and it should show the coverage percentage over time. A route that achieves 95% coverage one month and 70% the next is telling the plant something important.

condition monitoring report - Condition Based Monitoring
Condition based monitoring supplies the raw readings; the report is what turns them into a dated recommendation.

Trends are equally important. Each finding should be compared with the previous survey and labelled as new, unchanged, improving or escalating. Findings that remain open for several reports deserve their own list, because they reveal a gap between detection and action. In many plants that gap, not detection, is the biggest weakness of the whole programme.

Programme health indicators worth reporting every month or quarter include:

  • Route coverage achieved versus planned.
  • Number of open recommendations by severity and age.
  • Recommendations closed in the period and the share confirmed at repair.
  • Failures on monitored assets that occurred without a prior finding.
  • Changes to alarm limits or baselines and the reason for each.

Delivery Formats for a Condition Monitoring Service Indonesia Contract: Periodic and Online

For periodic route-based surveys, the condition monitoring report normally follows each round, often monthly for critical rotating equipment. The report should arrive within an agreed number of days after data collection, because a finding that takes 3 weeks to reach the planner has already lost much of its warning time.

Online systems change the rhythm. Data arrives continuously and alarms can trigger at any time, so reporting usually splits into immediate notifications for alarms that an analyst has confirmed and a regular summary report that consolidates findings and programme health. TVP’s Tiara Reliability Remote Monitoring programme is built on this principle: the right information, received by the right function, at the right time, so that mitigation decisions are based on current asset wellness status and connect the asset manager, reliability engineer and PdM technology specialist.

Whichever model is used, the condition monitoring report should use the same asset tags and severity scale as the plant’s CMMS and earlier reports. Consistency allows trends to be followed for years, even when the provider or the technology changes.

Language also matters in Indonesian plants. Technical evidence is usually written in English, but the executive summary and action list of the condition monitoring report can be bilingual if that is how planners and supervisors work. What matters is that nobody misreads a recommendation because of the language it was written in.

Closing the Loop With Repair Feedback

The only reliable measure of report quality is what technicians find when they open the machine. Every completed recommendation should come back to the analyst with a short note: what was found, whether it matched the diagnosis, and photographs of damaged parts where possible. Recorded in the next condition monitoring report, this feedback improves the next diagnosis and builds trust between operations and the monitoring team.

Two figures summarise this well. The first is the share of findings confirmed at repair. The second is the number of functional failures on monitored assets that were not preceded by a finding. When the second figure is not zero, a structured root cause analysis should ask whether the failure was detectable, whether the interval was too long, or whether the finding was made but not acted on.

Choosing a Condition Monitoring Report Standard for Your Contract

Many disputes over a condition monitoring report come from contracts that specify instruments and visit frequency but say nothing about the deliverable. When writing or renewing a condition monitoring service contract, specify the report itself:

  • Required sections and their order, including the coverage statement and action list.
  • Severity definitions and the response time for each level.
  • Maximum time from data collection to report delivery, for example 5 working days.
  • Format of the action list for import into the CMMS.
  • Competence level of the analyst who signs the condition monitoring report.
  • Access to the underlying data for audit and second opinion.

TVP has provided condition monitoring and data services under contract, including the project listed as Contract Service for PdM Data Acquisition at PT. Chevron Pacific Indonesia. Details of what a full condition based monitoring service includes are available from the TVP team. General background on the discipline is summarised in the condition monitoring overview.

FAQ

What should a condition monitoring report contain?

At minimum: the assets covered and any that were missed, a severity status for each asset, the evidence behind every abnormal finding, a likely fault diagnosis, a clear recommendation with a deadline, and a comparison with the previous survey. A summary page for managers and detailed pages for engineers should both be present, so each reader finds what they need without wading through raw data.

How often should we receive a condition monitoring report?

The routine report usually follows the survey interval, often monthly for critical rotating equipment on periodic routes. Online systems may produce weekly summaries. Urgent findings must not wait for the routine report: they should be communicated the same day by a defined channel, with the formal report following. The contract should state both the routine frequency and the response time for urgent findings.

Who should read the report in our plant?

Three groups. Maintenance planners need the recommendation list to create work orders. Reliability engineers need the technical evidence to confirm diagnoses and track recurring problems. Managers need the summary of asset health, overdue actions and trends. A good report is structured so each group reads its own section, and the action list is formatted to be imported or copied into the CMMS.

How do we know if the report findings were correct?

Close the loop. When a recommended repair is carried out, record what the technicians actually found, such as bearing damage, misalignment or contamination, and feed that back to the analyst. Track the share of findings confirmed at repair and the failures that occurred without warning. Those two figures measure diagnostic quality far better than the number of pages delivered.

Should raw data be included in the report?

Only the data that supports a finding: the relevant spectrum, waveform, trend, thermogram or oil result, annotated so the reader sees why the analyst reached the conclusion. Full raw data should remain accessible in the monitoring database for audits and second opinions. Dumping every plot into the report hides the important evidence and makes the document harder to act on.

Conclusion

A condition monitoring report is judged by the decisions it produces. It should state coverage honestly, apply a consistent severity scale, show annotated evidence, give specific recommendations with deadlines, and track every finding until the repair confirms or corrects it. Specify those elements in your contract and review them every month, and the monitoring programme will start paying for itself in avoided failures.

Talk to TVP. If you want your current condition monitoring report reviewed or a reporting standard written into your next contract, email info@tiaravib.com, call 021 5704200, or WhatsApp +62 821-1378-3727. Office: Jl. Penjernihan II No. 5A, Bendungan Hilir, Jakarta Pusat 10210.