Direct answer (AEO): Partial discharge analysis is a predictive maintenance technique that detects and characterises the small, localised electrical discharges that occur inside or on the surface of degraded insulation in medium voltage and high voltage equipment. A partial discharge, or PD, is a discharge that bridges only part of the insulation between two conductors rather than the whole gap, so the asset continues to operate while the insulation is progressively eroded. For a predictive maintenance Indonesia program, PD analysis is the earliest reliable indicator of insulation failure in switchgear, cables, transformers, and rotating machine stator windings: it appears months to years before flashover, it can be measured while the equipment remains energised and in service, and the pattern of the discharge identifies the physical defect that produced it. For the wider context, read our guide to predictive maintenance for Indonesian plants.
Need partial discharge analysis for your switchgear or cables? Contact us — email info@tiaravib.com or WhatsApp +62 821-1378-3727.
At a Glance
- What it is: measurement and interpretation of localised electrical discharges that occur in weakened insulation without bridging the full conductor gap.
- Why it matters: PD is a symptom and a cause of insulation degradation — it both indicates existing damage and accelerates further damage.
- Common assets: medium voltage switchgear, GIS, cable terminations and joints, transformer bushings, and generator or motor stator windings.
- Two survey modes: online PD measurement with the equipment energised and under normal load, and offline PD testing at elevated voltage during an outage.
- Detection methods: transient earth voltage (TEV), ultrasonic acoustic detection, and high frequency current transformer (HFCT) coupling.
- Typical investment: a portable PD survey route costs a fraction of one preventable switchgear failure, and a modern medium voltage board can take 6 to 12 months of continuous degradation before flashover.
What Partial Discharge Actually Is
Partial discharge is an electrical discharge that occurs within an insulation system without completely bridging the electrodes. The classic textbook illustration is a small void inside solid insulation. The void has a lower dielectric strength than the surrounding dielectric, so the field concentrates inside it and the gas in the void ionises while the bulk insulation still holds. The discharge is therefore partial in two senses: it occupies only part of the insulation path, and it releases only a fraction of the energy that a full breakdown would release.
This definition is what makes PD analysis such an early indicator. According to IEEE, insulation degradation follows a self-reinforcing sequence. Each discharge event erodes the void wall, deposits conductive by-products on the cavity surface, and generates heat, ozone, and chemical attack on the polymer. The damaged region grows, the local field becomes more concentrated, and the discharge becomes more energetic — so PD is simultaneously a symptom of existing insulation weakness and a mechanism that makes that weakness worse. A component that shows sustained PD activity will eventually fail; the useful engineering question is not whether but how fast, and that is the question PD analysis is designed to answer.
PD is also a broad family rather than a single defect. The internal void described above is one mechanism. Surface discharge, or tracking, creeps along the interface between a dielectric and air. Corona discharge occurs at sharp conductor points where the local field exceeds the breakdown strength of air, including at high altitude or in humid conditions. Floating discharge occurs where a component is not properly bonded to the intended potential, so a small gap repeatedly charges and discharges. Each mechanism produces a different signature, and the practical value of a competent analysis is that it moves the diagnosis from “the equipment is discharging” to “the equipment has a floating electrode at the cable termination”, which is an actionable statement.
Which Assets Benefit Most From PD Analysis
Although PD can occur in any insulation system, a small number of asset classes account for most of the practical value in industrial plants. Medium voltage switchgear is the classic case, because the equipment is numerous, the insulation is often cast resin or air-insulated with limited quality control at the interfaces, and the failure consequences are severe. Cable terminations and joints follow, particularly in cables that were installed under site conditions rather than factory-controlled conditions, where workmanship at the termination is frequently the weak link. Transformer bushings, both oil-impregnated and resin type, present a similar interface problem.
Rotating machine stator windings are the fourth major case. In generators and high voltage motors, PD in the stator insulation is influenced by the manufacturing process, by thermal cycling over the machine’s life, and by the contamination and humidity the machine experiences. A generator assessment that includes PD measurement off-line and, where possible, on-line gives the owner a view of stator insulation health that no other technique provides, and it is a standard part of modern machine condition assessment.
Online and Offline PD Measurement: Choosing the Right Method
The single most important practical choice in PD analysis is whether the measurement is made online, with the equipment in service, or offline, during an outage with the equipment de-energised and an external voltage source applied. The two modes answer different questions and neither replaces the other.
Online measurement captures the equipment in its real operating state: real voltage, real load, real temperature, real humidity. Its great advantage is that it requires no outage and therefore has almost no cost of lost production, and because a portable instrument can be walked from panel to panel, a single technician can cover a large population of board compartments in a day. Its limitation is that the applied voltage is the normal service voltage, so defects that only become active at higher stress remain silent. A second limitation is noise: an industrial plant at full production generates a great deal of electrical and acoustic interference, and separating genuine PD from interference is the core technical skill of online PD work.
Offline testing applies a controlled voltage, often raised above service level, with the equipment isolated. That higher stress activates defects that remain dormant under normal operating voltage, and because the plant is quiet during a shutdown, the interference floor is far lower. The method therefore tends to be more sensitive and easier to interpret, and it allows measurements that require a defined circuit condition, such as a partial discharge measurement combined with a tan delta insulation assessment. Its cost is the outage itself, which for a critical feeder can be substantial.
Most mature programs use both. An annual or semi-annual online PD survey provides trend data across the whole equipment population at low cost, and targeted offline testing is scheduled during the next planned outage for the specific assets the online survey has flagged. That combination gets maximum coverage from the cheap, no-outage method and maximum sensitivity where it is actually needed.
Detection Methods and What Each One Sees
Because PD generates energy in several physical domains, it can be detected in several ways. Each method has a distinct sensitivity and a distinct set of blind spots, and the most reliable surveys combine at least two.
| Method | How It Works | Strong Point | Main Limitation |
|---|---|---|---|
| Transient earth voltage (TEV) | Detects the high frequency voltage transients that couple onto the earthed metalwork of a switchgear enclosure when discharge occurs inside | Extremely fast to apply — the sensor is held against the panel surface, so a whole board is screened in minutes | Reads only what couples to the enclosure wall; a defect deep inside a compartment can be attenuated, so it is a screening tool rather than a locator |
| Ultrasonic acoustic detection | Detects the acoustic emission generated by the discharge, typically using a directional airborne probe or a contact probe | Excellent for locating surface tracking and corona, and for confirming a TEV finding at a specific compartment | Airborne ultrasound is attenuated by solid barriers, and loud mechanical plant noise raises the detection floor |
| High frequency current transformer (HFCT) | A split-core current transformer clamped around the earth strap or cable screen measures the high frequency current pulses that flow to earth | Direct and quantitative measurement of discharge current, well suited to cable screens and machine windings | Requires access to an earth conductor and careful interpretation, since other high frequency currents share the same path |
| Coupling capacitor with a measurement unit | A dedicated capacitive coupler is installed on the equipment and fed to a PD instrument or a permanently installed monitor | Highest measurement quality and repeatability, and the basis for permanent continuous monitoring | Cost and installation effort, which limits it to the most critical assets unless the coupler is factory fitted |
The methods are complementary in a very practical way. A transient earth voltage reading of unusually high activity points at a specific switchgear compartment; an ultrasonic probe then localises the signal on a specific cable termination or busbar joint; an HFCT clamped on the relevant screen or earth connection confirms and quantifies the discharge current. The conclusion after all three carries far more weight than any one of them alone, and the combined pattern helps distinguish a real insulation defect from an external noise source.

Reading the Pattern: From Detection to Diagnosis
Detection is the easy half of PD analysis. Interpretation is where the technique earns its keep, because a discharge count alone tells the maintenance engineer almost nothing about what to do next. Three attributes of the signal carry the diagnostic weight.
The first is phase position. PD activity in alternating current equipment is not uniform across the voltage cycle; discharges tend to cluster at particular phase angles, and the distribution of those clusters relative to the positive and negative half cycles distinguishes internal voids from surface tracking from corona. The second is the discharge magnitude distribution, whether activity is concentrated in a small number of large events or spread across many small ones, which behaves differently as damage develops. The third, and in practice often the most reliable, is the trend over time. A single high reading in a noisy plant may be an artefact; the same reading repeated and growing across a series of surveys is a defect in progress.
Trend also answers the question of what constitutes a significant change. In a program that measures the same asset with the same instrument and the same method at each visit, the reference is the asset’s own history rather than a generic threshold borrowed from a different plant. Standards provide the framework, and the ISO 17359 framework for condition monitoring is the relevant reference for structuring the programme, while equipment-specific guidance governs the interpretation. Because technique competes with interference, PD work is one of the areas where certified personnel with documented method and calibration matter most. When a plant lacks the internal capability to run a PD programme, an established condition monitoring service that already holds the instruments, the method, and the interpretation experience is usually the faster route to reliable results.
Building a PD Survey Route That Actually Works
A PD programme succeeds or fails on route design, because the value comes from comparison and comparison requires consistency. Every survey should visit the same asset population, in the same order, with the same instrument settings, and record results in a database that preserves history rather than in a set of files per visit. Load condition and weather at the time of measurement are recorded alongside the reading, because humidity and load both change PD behaviour and an unrecorded change of condition will later look like a change of condition in the asset.
Frequency follows criticality. Switchgear serving a process unit that cannot tolerate an unplanned trip, and cable terminations that cannot be inspected by any other means, justify a monthly or quarterly survey. Lower consequence equipment can be surveyed annually. The point is not to measure everything as often as possible but to make the interval a deliberate decision that reflects the consequence of failure — which is exactly the logic that an equipment criticality ranking applies to the whole maintenance programme. When the same switchgear compartment or cable joint reports elevated PD across successive surveys, the asset has earned a formal investigation rather than another measurement, and a bad actor analysis is the appropriate mechanism to determine whether the cause is a manufacturing problem, an installation problem, a systemic design issue, or simply one asset reaching the end of its insulation life.
What a PD Analysis Service Delivers
Tiaravib delivers partial discharge analysis as an engineering service rather than a test result. The work begins with a survey plan: which switchgear boards, cable circuits, transformers, and machine windings are in scope, which assets are critical enough to justify permanent coupling capacitors, and what interval each population warrants. Survey work is then carried out by personnel trained in PD measurement, using transient earth voltage, ultrasonic, and HFCT techniques as the asset requires, with instrumentation calibrated and the measurement method documented so that results are traceable.
The deliverable is a report that separates detection from diagnosis. Each finding is presented with the measurement method used, the raw and processed readings, the proposed mechanism, and a severity classification with a recommended action and time frame. Where a switchgear compartment shows surface tracking, the report identifies the affected termination rather than reporting “board 3 has PD”. Where the cause appears systemic, such as a cable termination type that is degrading across an entire installation, the finding is escalated as a design or workmanship issue rather than logged as a series of individual defects.
Where a plant requires continuous visibility rather than periodic snapshots, the survey can be extended into an online monitoring arrangement, with fixed sensors and a remote monitoring centre providing trend data and alerting between visits. For plants that are beginning electrical condition monitoring from a low base, PD analysis is frequently the highest-value entry point, because it addresses an entire failure mode that temperature, vibration, and visual inspection cannot detect until the damage is advanced.
How PD Analysis Fits With Other Electrical Techniques
No single technique covers insulation condition, and PD analysis is best understood as the early-warning member of a set. Infrared thermography analysis detects the resistive heating that a degraded connection produces, which is a different failure mechanism and appears later in the sequence. Tan delta analysis measures the overall dielectric loss of an insulation system, which is a bulk property, whereas PD measurement examines localised defects that may be significant long before they change the bulk loss figure. Dissolved gas analysis and winding diagnostics add further evidence for oil-filled units, where PD activity leaves chemical traces in the oil.
For rotating machines, PD measurement sits alongside electrical analysis for induction motors, which looks at the machine from the supply side, and vibration transient analysis, which catches mechanical events. Where permanent sensing is installed, PD, temperature, and load trends are combined on the same asset record as part of condition based monitoring, and prioritising which assets deserve the deepest coverage is the function of equipment criticality ranking.
External references that define the technical basis for this work are available from IEEE for insulation diagnostics and high voltage testing practice, from IEC for the equipment standards that medium voltage switchgear and measurement instruments are built to, and from the National Fire Protection Association for the electrical safety framework that governs work on energised equipment.
Key Takeaways
- Partial discharge is a localised electrical discharge that does not bridge the full insulation gap, so equipment keeps running while its insulation is progressively destroyed.
- PD is both a symptom of insulation weakness and a cause of further degradation, which is why partial discharge analysis gives a longer warning window than almost any other electrical technique.
- Online PD measurement requires no outage and covers a large asset population quickly, while offline testing under raised voltage is more sensitive but costs an outage; mature programmes use both.
- Transient earth voltage, ultrasonic, and high frequency current transformer methods are complementary, and combining at least two substantially improves confidence in a finding.
- Diagnosis depends on phase position, magnitude distribution, and trend — the trend across consistent surveys is usually the most actionable signal.
- Systematic PD programmes become the earliest and most cost-effective detection layer for insulation failure, and they integrate directly with thermography, tan delta analysis, and dissolved gas analysis.
Frequently Asked Questions
What is partial discharge and why is it dangerous?
Partial discharge is a small electrical spark that occurs inside or on the surface of insulation without bridging the full gap between conductors, such as a discharge in a void within cast resin or along a contaminated cable termination surface. It is dangerous because it is both a sign of existing insulation weakness and an active mechanism that worsens it: each event erodes material, deposits conductive by-products, and concentrates the electric field further. Left untreated, the discharge grows until the remaining insulation can no longer withstand the voltage and a full flashover occurs.
Can partial discharge be measured while the equipment is still energised?
Yes, and online measurement is one of the main strengths of the technique. Transient earth voltage sensors are held against the outside of a switchgear enclosure, ultrasonic probes listen for the acoustic emission, and high frequency current transformers clamp around earth conductors or cable screens — none of which requires the circuit to be de-energised. Because PD behaviour depends on the applied voltage and the actual load, measuring in service captures the equipment in the condition that matters and avoids the cost of an outage.
What is the difference between online and offline partial discharge testing?
Online testing measures the equipment while it is energised at normal service voltage and load, which requires no outage and can cover a large asset population quickly. Offline testing isolates the equipment, applies a controlled voltage that is often higher than service level, and measures in a quiet plant with a much lower interference floor. Offline testing is generally more sensitive and easier to interpret, while online testing is cheaper and more practical for routine coverage. Most programmes combine both.
Which equipment should be checked for partial discharge first?
Start with medium voltage switchgear, because it is usually numerous, the insulation interfaces are the most common weak point, and failure consequences are severe. Cable terminations and joints come next, especially where installation quality is uncertain, followed by transformer bushings and high voltage rotating machine stator windings. The correct order for a specific plant is best set by equipment criticality ranking, which weighs the consequence of failure — production loss, safety, and repair time — rather than simply the equipment count.
How often should a partial discharge survey be carried out?
Frequency should follow consequence of failure. Switchgear serving a process unit that cannot tolerate an unplanned trip may warrant monthly or quarterly surveys, while lower consequence equipment may be adequate on an annual cycle. What matters most is consistency: the same assets surveyed in the same way with the same instrument settings, so that the trend over time is measurable. A rising trend across successive surveys is what justifies escalation, and it is the strongest single indicator that insulation deterioration is progressing.
Does a high partial discharge reading mean the equipment must be replaced?
Not necessarily, and that is precisely why interpretation matters. A high reading indicates that investigation is warranted, and cleaning, re-terminating, tightening a bonding connection, or replacing a bushing or cable termination may resolve the issue at a fraction of the cost of replacement. The decision depends on the defect mechanism, its location, and how the trend behaves after corrective work. Replacement is normally reserved for insulation degradation that is widespread, is progressing despite corrective action, or affects components that cannot be economically repaired.
Need a Partial Discharge Survey in Indonesia?
Tiaravib has delivered reliability and condition monitoring services to Indonesian industry since 1995. Send us your single line diagram and switchgear list, and we will propose a PD survey route with the technique mix, interval, and reporting format that fit your criticality ranking.
For a site assessment or pilot proposal, contact Tiaravib via WhatsApp +62 821-1378-3727 or info@tiaravib.com.